Skip to content
HES.
Contact Us
Sectors
Healthcare & HospitalsKeep patients safe and your accreditation secure, with infection, Legionella and AMR risk reducedWater & WastewaterStay in consent, and cut the energy and chemicals it takes to get thereCommercial & FacilitiesMeet your EPC and disclosure obligations while running cost and carbon fallAgriculture & Urban FarmingProtect your yield and soil while using less water and fertiliserPoultry FarmingProve you control the water your birds drink, with clean lines, no pathogens and the evidence in handLocal AuthoritiesMove your estate towards net zero with compliant assets, funded to saveEmerging MarketsBuild investable, accreditation-ready infrastructure on reliable water, sanitation and powerHotels, Hospitality & LeisureKeep guests safe and pools open, with Legionella risk controlled and pool-hall cost cutData CentresCut the cost and water your cooling burns, and harden Legionella control, without touching uptimeFood & Beverage ProcessingCut your trade-effluent bill and hold consent, without touching food safety or uptimeMental HealthKeep the ward safe, with a hand-hygiene option that carries no ingestion, fire or ligature riskJustice & CustodyHand hygiene that is safe to issue inside the wing, where alcohol products are restrictedSocial CareProtect residents and carers, with hand hygiene that is safe to use and kind to skinEducationCut infection-driven absence with child-safe hand hygiene, at a defensible cost across the estateFresh Produce Post-HarvestHold condition from harvest to the customer, and evidence the residue question that now sits with youHousing & Residential BlocksKeep residents safe from the electrical supply faults a five-yearly test cannot catch, every day between inspections
Solutions
Clean WaterControl pathogens, fouling and cost where conventional treatment failsAir & Infection ControlReduce airborne pathogens and infection risk, with no ozoneHand Hygiene & Infection ControlEffective hand hygiene with the alcohol risks removed, where alcohol gel is a liabilityEnergyCut energy and recover it from the systems you already runRenewable ElectricityGenerate power from water flow you already treat, with no new infrastructureAgriculture & SoilUse less water and fertiliser while protecting yield and soilElectrical Supply SafetyA continuous watch on the supply faults a periodic test cannot catch, with alarms and isolation built inPerishable Product LifeHold condition from harvest to the point of sale, and evidence what is left on the crop
Sectors
Healthcare & HospitalsKeep patients safe and your accreditation secure, with infection, Legionella and AMR risk reducedWater & WastewaterStay in consent, and cut the energy and chemicals it takes to get thereCommercial & FacilitiesMeet your EPC and disclosure obligations while running cost and carbon fallAgriculture & Urban FarmingProtect your yield and soil while using less water and fertiliserPoultry FarmingProve you control the water your birds drink, with clean lines, no pathogens and the evidence in handLocal AuthoritiesMove your estate towards net zero with compliant assets, funded to saveEmerging MarketsBuild investable, accreditation-ready infrastructure on reliable water, sanitation and powerHotels, Hospitality & LeisureKeep guests safe and pools open, with Legionella risk controlled and pool-hall cost cutData CentresCut the cost and water your cooling burns, and harden Legionella control, without touching uptimeFood & Beverage ProcessingCut your trade-effluent bill and hold consent, without touching food safety or uptimeMental HealthKeep the ward safe, with a hand-hygiene option that carries no ingestion, fire or ligature riskJustice & CustodyHand hygiene that is safe to issue inside the wing, where alcohol products are restrictedSocial CareProtect residents and carers, with hand hygiene that is safe to use and kind to skinEducationCut infection-driven absence with child-safe hand hygiene, at a defensible cost across the estateFresh Produce Post-HarvestHold condition from harvest to the customer, and evidence the residue question that now sits with youHousing & Residential BlocksKeep residents safe from the electrical supply faults a five-yearly test cannot catch, every day between inspections
Tools
Ask HESCase StudiesInsightsLabAbout
Contact Us
Energy

EPC B by 2031: What Commercial Landlords Must Do Before the Deadline Arrives

3 min read

Commercial properties in England and Wales must reach EPC B or above by 2031 under confirmed government plans. The interim 2027 target has been dropped, and buildings of 11,000 square feet or below are exempt. For landlords of larger assets, this is a firm compliance deadline that will directly affect lettability and capital value. Buildings that fall short risk becoming stranded assets before the decade is out, and the cost of late action will be significantly higher than the cost of planned improvement.

What exactly is the obligation and does it apply to my portfolio?

The confirmed requirement is that commercial properties must achieve EPC B or above by 2031. The earlier 2027 interim milestone has been removed, leaving a single hard deadline. Any commercial building above 11,000 square feet that cannot demonstrate an EPC B rating by that date will be non-compliant, which carries direct consequences for the ability to let or transact the asset.

Landlords with mixed portfolios need to map each asset against the 11,000 square foot threshold carefully. Buildings below that size are currently exempt, but the majority of income-producing commercial stock will fall within scope. If your estate has not been audited against this threshold, that is the first planning step, because the scope of the obligation determines the scale of the capital programme required.

What is the stranded asset risk if I delay action?

A stranded asset in this context is a building that cannot be legally let or easily sold because it fails to meet the minimum energy performance standard. The 2031 deadline is close enough that lenders, institutional investors and occupier procurement teams are already factoring EPC ratings into underwriting and leasing decisions. A building that cannot demonstrate a credible path to EPC B is being discounted today, not just in 2031.

Owners who wait until 2029 or 2030 to begin retrofit programmes will face compressed contractor availability, higher material costs and the risk that planning or building control processes cause overruns that push completion past the deadline. The cost penalty of last-minute action is consistently higher than phased, planned improvement. Quantifying the performance gap across the estate now allows capital expenditure to be sequenced across the available window rather than concentrated at the end of it.

How should I sequence energy improvement work across a multi-asset estate?

The starting point is an honest performance audit of each asset in scope. That means establishing the current EPC rating, understanding the gap to EPC B, and identifying which improvements carry the largest performance uplift relative to their cost and disruption. Operational energy improvements, including heating, cooling, ventilation and lighting controls, can often move a rating meaningfully before any structural fabric work is required, and they can be implemented without vacant possession.

For assets with active tenancies, improvement programmes need to be coordinated with lease events, break clauses and tenant obligations around access and reinstatement. A phased programme that aligns capital spend with lease events reduces disruption and avoids abortive work. Landlords with large estates should prioritise assets where the performance gap is widest and where the stranded asset risk is most immediate, whether because leases are expiring or because the asset is being actively marketed.

What does the dropped 2027 interim target mean for planning timelines?

The removal of the 2027 interim milestone reduces the short-term compliance pressure but creates a risk that owners treat 2031 as a distant problem rather than an immediate planning obligation. Six years is a short window when retrofit programmes for large commercial buildings typically take 12 to 36 months to design, procure and deliver, particularly where planning consent or significant mechanical and electrical replacement is involved.

The dropped interim target also means the market will not receive the early signal that a 2027 deadline would have provided. Retrofit supply chains, including specialist contractors and energy consultants, may face acute capacity constraints as the 2031 deadline approaches and demand concentrates. Owners who begin scoping and tendering programmes now are insulating themselves against both cost inflation and delivery risk.

Questions answered

Frequently asked

Are buildings below 11,000 square feet completely exempt from the EPC B requirement?

Yes, under the current confirmed plans, commercial buildings of 11,000 square feet or below are exempt from the 2031 EPC B requirement. Landlords with smaller assets should still monitor policy developments, as thresholds can change, and strong energy performance remains a factor in occupier demand and asset value regardless of mandatory compliance.

Can I rely on a current EPC rating, or do I need a new assessment?

An existing EPC may not reflect the current performance of a building if significant works have been carried out since it was issued, or if it was based on assumptions that no longer apply. Before making capital planning decisions, landlords should verify that each EPC in the portfolio is current, accurate and based on actual building characteristics. An out-of-date or inaccurate rating could understate the improvement needed.

How does the 2031 deadline affect asset transactions before that date?

Buyers, lenders and institutional investors are already pricing EPC risk into valuations and loan terms. An asset with a significant gap to EPC B and no credible improvement plan is likely to attract a lower price or face tighter lending conditions today, not only in 2031. Vendors planning to transact before the deadline should consider whether demonstrable progress on energy performance could protect or improve the price achieved.